Mintus Grove Square -390kW Solar System

Mintus Property Group chose Grove Square as the site for the beginning of the Solar Rollout across their shopping centres. Solar will offset 2​2% of the energy usage and 832 tonnes of CO2 ​will be avoided​ each year, helping begin the journey of reducing the carbon footprint across the network of shopping centres. The payback of 2.5 years will be imperative to assist in cash flow to invest in other areas of improvement
390kW

System Size

$117,000

Saving Per Year

2.5 years

ROI

Mintus's Grove Square Shopping Centre is a vibrant retail hub known for its diverse mix of stores and community-focused amenities.

Designed to cater to a wide range of shoppers, it offers a modern and convenient shopping experience, attracting both locals and visitors.

With a commitment to sustainability and innovation, the centre continues to evolve as a key destination in the area.

Objectives

The solar installation at Grove Square Shopping Centre was designed to significantly reduce reliance on grid energy, targeting the site's larger energy meters to maximise impact.

By harnessing clean solar power, the initiative supports tenants in achieving their sustainability goals while aligning with the centre's broader commitment to environmental responsibility.

The project aimed to reduce operational emissions and also strengthen the centre's group's role as a leader in sustainable retail.

Solution

To optimise energy savings and maximise roof space efficiency, three segregated solar systems were installed on the centre's highest consuming energy meters.

This targeted approach ensures maximum efficiency, directly offsetting grid consumption where demand is highest.

Challenges

Installing the solar system at Grove Square required careful planning to navigate the complexities of a busy retail environment.

Limited roof access and the challenge of lifting panels to the rooftop demanded specialised equipment and coordination to ensure a smooth installation process.

With high foot traffic and ongoing store operations, maintaining safety and minimising disruption were top priorities.

A staged installation approach was essential to ensure each system was functioning at capacity.

Careful scheduling was required to manage downtime while ensuring continuous access for businesses and shoppers.

By implementing strict safety protocols and strategic planning, the project was completed efficiently while upholding the highest standards of workplace and public safety.